Details:

  • Client:

    General constructor: General partnership “B.S.L. Infra”

  • Period:

    01/2022 - 01/2023

  • Place:

    Rīga, Latvia

Description:

Electronic communications system and external network construction works and putting into operation at the Rail Baltica construction section – Riga Airport (Construction of railway stations, related infrastructure and overpasses). The Stage 1 section is from Zolitūde Street to the railway station at the Riga International Airport.

  • Electronic communications systems (construction of weak current networks / reconstruction for electronic communications operators (Latvian State Radio and Television Centre, LMT, Latnet, Telia Latvija) and Latvenergo, LGS, Riga Airport;
  • Reconstruction of security systems of the state joint stock company Riga International Airport; outdoor video surveillance systems (at two parking areas, overpass, seven entry/exit points); four exit point solutions; station access road security system solutions;
  • Construction of ducts;
  • Reconstruction of area cable networks;
  • Construction of area security systems;
  • Configuration, integration and putting into operation of all constructed systems.

This section of Rail Baltica is very comprehensive and complicated: the station and railway that will come into the airport via overpass, must fully integrate with the airport’s infrastructure by respecting also other huge projects planned nearby.

Ultimate contracting authority: SIA “Eiropas dzelzceļa līnijas”