Description:
- Full-cycle D&B works on 5G connections: network design, material supply, construction works throughout the territory of Germany. Estimated project volumes: 5G connection network length: ~100 km, connections to antennas and towers: ~ 420).
- D&B works on backbone networks for 5G needs. Estimated project volumes: backbone network length: ~360 km;
The umbrella agreement provides for conclusion of separate contracts for the implementation of specific projects.
Currently, 7 service contracts have already been concluded:
Service contracts for the construction of 5G connection:
- Burlafingen-Freihalden (total length of the track: 1 km; timeframe for its implementation: 08/2022-11/2022)
- Erzgebirge (total length of the track: 3 km; timeframe for its implementation: 08/2022-10/2022)
- Nordbayern (total length of the track: 5 km; timeframe for its implementation: 08/2022-12/2022)
- Sternenfels-Eichelberg (total length of the track: 4 km; timeframe for its implementation: 09/2022-12/2022)
- Rostock-Neubrandenburg (total length of the track: 4 km; timeframe for its implementation: 07/2022-10/2022)
Construction of backbone networks for 5G needs:
- Diefenbach-Hoheneck (total length of the track: 33 km; timeframe for its implementation: 06/2022-04/2023)
- Fischbachtal-Rodgau (total length of the track: 33 km; timeframe for its implementation: 10/2022-08/2023)
We are greatly satisfied that by implementing the works within these projects, we contribute to the development of technological processes and fulfil the company’s mission “We change the world!”