Back

Details:

  • Client:

    FREYLER Industriebau GmbH

  • Period:

    09/2022 - 12/2023

  • Place:

    Porschestraße 8, 41836 Hückelhoven, Germany

Description:

Construction of Power Networks in Dico Drinks new production hall and warehouse:

  • wiring assembly works in all buildings, incl. emergency lighting, office lighting, socket switches and boxes, lighting and blinds control system, external lighting;
  • main cable construction works for technological equipment;
  • delivery and assembly of the electric distribution cabinets.