Description:
Full cycle design and construction (D&B) works: construction of external land border of the Republic of Latvia – Republic of Belarus in nine priority stages.
Within the project the following will be constructed: high security fence, roads, patrol trails, patrol boardwalks, pontoons, tunnel at a railway crossing.
The total length of nine stages is 83 km.
The construction design solutions will be adapted to each particular territory and actual natural conditions – swamps, scarps, flooded areas, lake crossings.